Sunday, April 06, 2008

All aboard (Part 2)

Not much to report. Michelle and I have been continuing our work on Kierans trainset. The track and ballast are now completely pinned down to the board, and I purchased 3 buffer stops for the end of the lines. I have also added a single line level crossing too. Michelle has built for me the latest building that will stand on the set - a signal box (see picture below)

I've now been constucting one of the tunnels. Using small wooden supports, I have placed some wire mesh to simulate the contours of a hill. Paper-mache will be added later. Once that has dried, we can then add the grass scatter-mats to cover the hill with realistic grass.









No comments:

Post a Comment